S790 shoring: Key Features
Maximum shored height: Up to 3.80 metres
Working width: 1.00 – 7.00 metres
Suitable for excavators: mobile or crawler excavators from 20 tonnes.
Flexibility and Efficiency in Using the S790 shoring
The SBH 790 shoring uses a single-guide system in which the shoring panels are placed in one guide slot. This design simplifies installation and dismantling, resulting in time savings on the construction site.
Thanks to the adjustable roller supports, long pipes can be easily inserted, even in confined spaces. The ability to vary the height of these roller supports offers additional flexibility during pipe installation.
Safety and Stability on the Construction Site
In settlement-prone areas, the SBH 790 shoring provides a stable solution. By adding a base support, greater pipe clearance heights can be achieved. In addition, the use of a bracing system makes it possible to create excavations without struts, improving safety and accessibility.
Versatility for Various Applications of the S790 shoring
The SBH 790 is particularly suitable for:
-
Medium-sized pipeline construction projects
-
Installation of large pipes
-
Construction projects in settlement-prone soils
-
Situations where fast and efficient installation is required
With the option to completely close off pits with corner sliding beams and shoring panels, this system offers a complete solution for complex construction needs.